Dormay Street

Site information

This site is being used to connect the existing local combined sewer overflow (CSO) to the main tunnel. It is also used to drive a long connection tunnel southwards to King George’s Park and northwards to Carnwath Road Riverside, to connect the CSOs at Dormay Street and King George’s Park to the main tunnel. This connection tunnel is known as the Frogmore connection tunnel.

Dormay Street

Following a pause as part of our response to the COVID-19 outbreak, we have resumed some works at our Dormay Street site. We have introduced several additional precautions so that our team can do this work safely to continue building the super sewer.

Charlotte, our Tunnel Boring Machine (TBM), began her journey towards King George's Park in early 2019 and arrived to site in later that year. You can read about the recent break through here.

Earlier this year, Charlotte was lifted up from the King George’s Park shaft and driven back to Dormay Street. She is now continuing to complete the construction of the Frogmore connection tunnel towards our main drive site at Carnwath Road Riverside, where she is due to arrive in Spring 2020.

You can read more about Charlotte's lift and journey from our King George's Park site to Dormay Street here.

For more information, look at the latest CLWG presentation on the tab below.

Our standard working hours are (with a 1-hour mobilisation period before and after these times):

  • Monday – Friday: 8am – 6pm

  • Saturday: 8am – 12 midday

Additionally, we have maintenance periods on the weekend:

  • Saturday: 1 – 5pm

  • Sunday: 10am – 4pm

There will be a period of 24-hour working. However, activities will be predominantly below ground.

As a precautionary measure due to the current public health situation, our Community Liaison Working Group meetings are currently postponed.

We’re sorry for any inconvenience this might cause, however please get in touch via our 24-hour Helpdesk on 08000 30 80 80 or email [email protected] if you would like to speak to a member of the team.

 

The date for the next Dormay Street and King George's Park CLWG will be available shortly.

You can see the the minutes and presentation from the last CLWG below. If you are interested in finding out more about our community liaison working group please email [email protected]

14 November, 2019 CLWG Minutes
14 November, 2019 CLWG Presentation

11 July, 2019 CLWG Minutes
11 July, 2019 CLWG Presentation

Our Dormay Street team are committed to managing our works and mitigating any impacts. Examples of measures we currently have in place include:

  • Hoarding has been erected along the site boundary

  • Vehicle movements outside of standard hours will be restricted

  • Use of low level directional lighting

  • Set limits to control activities, such as noise (Section 61 approval) from LB Wandsworth

There are lots of ways to find out what’s happening at this site, you can:

  • Call our 24 hour Tideway Helpdesk 08000 30 80 80 or email [email protected].

  • Take a moment to read the latest updates on the noticeboards on our hoardings.

  • Visit Tideway's Community Information Centre at Carnwath Road, the first Tuesday of the month, 3pm – 7pm. Our team will be able to answer your questions and talk about the work.

  • Join our regular Community Liaison Working Group meetings, to attend the meetings or receive the minutes and presentations from past meetings, email [email protected]. Meeting details will be emailed, published online and on site hoardings.

You can also follow our progress and what we're doing in our local communities on TwitterInstagram and Facebook.