Carnwath Road Riverside

Site information

This site is made up of two parts; a main site (which includes Whiffin Wharf, Hurlingham Wharf, Carnwath Road Industrial Estate and an area of the River Thames foreshore) and a small highways work site.

Carnwath Road Riverside

Following a pause as part of our response to the COVID-19 outbreak, we have resumed some works at our Carnwath Road Riverside site. We have introduced several additional precautions so that our team can do this work safely to continue building the super sewer.

Rachel, one of the six Tunnel Boring Machine’s (TBM), began her journey in spring 2019, towards Acton. She will be resurfacing in summer 2020 at our Acton Pumping Station site.

The site team at Carnwath Road Riverside are working hard to keep Rachel moving towards Acton and removing the spoil from the muck bin. The muck is being transported to Rainham from our site by barge. One barge removes up to 50 lorries off the road.

Rachel has tunnelled over 3.5km, and is currently on her way to our Hammersmith Pumping Station site.

Charlotte, our TBM creating the Frogmore Connection Tunnel, is currently on her way from our Dormay Street site, which is located across the River Thames. Charlotte will be arriving at Carnwath Road Riverside in spring 2020. 

You can track Rachel's progress here.

For more information, look at the latest CLWG presentation on the tab below. 

 

We are working 24-hours a day as tunnelling has begun. This will be taking place predominantly underground.

All work to support the tunnelling activities takes place between 7am-10pm.

Our standard construction working hours are (with a 1-hour mobilisation period before and after these times):

  • Monday – Friday: 8am – 6pm

  • Saturday: 8am – 1pm

Additionally, we have maintenance periods on the weekend:

  • Saturday: 1 – 5pm

  • Sunday: 10am – 4pm

As a precautionary measure due to the current public health situation, our Community Liaison Working Group meetings are currently postponed.

We’re sorry for any inconvenience this might cause, however please get in touch via our 24-hour Helpdesk on 08000 30 80 80 or email [email protected] if you would like to speak to a member of the team.

 

The next Carnwath Road Riverside CLWG will be announced shortly. 

You can see the the minutes and presentation from the last CLWG below. If you are interested in finding out more about our community liaison working group please email [email protected]

24 February 2020 - CLWG Presentation

8 October 2019 - CLWG Presentation

Our Carnwath Road team are committed to managing our works and mitigating any impacts. Example of measures we currently have in place include:

  • There is an acoustic shed over the tunnel drive shaft 

  • All static machinery and plant are being screened/enclosed

  • Hoarding has been erected on the site boundaries

  • Vehicle movements outside of standard hours are restricted

  • Use of low level directional lighting

  • Set limits to control activities, such as noise (Section 61 approval) from LB Hammersmith & Fulham

There are lots of ways to find out what’s happening at this site, you can:

  • Call our 24 hour Tideway Helpdesk 08000 30 80 80 or email [email protected].

  • Take a moment to read the latest updates on the noticeboards on our hoardings.

  • Visit Tideway's Community Information Centre at Carnwath Road, the first Tuesday of the month, 3pm – 7pm. Our team will be able to answer your questions and talk about the work.

  • Join our regular Community Liaison Working Group meetings, to attend the meetings or receive the minutes and presentations from past meetings, email [email protected]. Meeting details will be emailed, published online and on site hoardings.

You can also follow our progress and what we're doing in our local communities on TwitterInstagram and Facebook.

Submissions to the council
We have been making a number of submissions to the London Borough of Hammersmith and Fulham as part of the consents, as we need to secure before starting different phases of work at Carnwath Road Riverside. These submissions will be available to view on the London Borough of Hammersmith and Fulham’s planning portal. Please click here to be redirected. This includes the submissions for Hammersmith Pumping Station. If you are interested in commenting on these submissions, please ensure you respond directly to the London Borough of Hammersmith and Fulham. The latest Air Quality and Noise reports for Carnwath Road Riverside can be found here.